Bill Commons

MO SB 1208

died on adjournment

SB 1208 - Under the act, a retail electric supplier shall offer net metering, as defined in the act, to customer-generators pursuant to a Public Service Commission approved tariff of an electrical corporation or contract approved by the governing body of other retail electric supplies under certain options described in the act. A customer-generator's facility shall be equipped with certain equipment including, but not limited to, necessary electric distribution system upgrades. If the electricity generated by the customer-generator exceeds the electricity supplied by the supplier during a billing cycle, the customer-generator shall demand charges for the billing cycle. Each qualified electric energy generation unit used by a customer-generator shall be installed, maintained, and repaired in accordance with all applicable industry standards described in current law. All qualified electric energy generation units utilizing battery backup shall be installed to operate completely isolated from the retail electric supplier's system including all neutral connections and grounding points during times of back up operation. Unless allowed under the provisions of the act, no retail electric supplier shall impose any fee or other requirement as described in current law, except that a retail electric supplier may require that a customer-generator's system contain adequate surge protection, or other accessible device that would allow emergency response personnel to disconnect from the electric distribution system. Applications by a customer-generator for interconnection of a qualified electric energy generation shall be accompanied by a plan for the customer-generator's electrical generating system and reviewed by a retail electric supplier, unless mutually agreed to. Prior to the interconnection of the qualified electric energy generation to the retail electric supplier's system, the customer-generator will furnish a retail electric supplier a certification from a professional electrician or an engineer deemed qualified by the retail electric supplier. If the professional electrician or engineer is not licensed, the retail electric supplier may require a bond or other form of financial security to ensure the safe installation and operation of the qualified electric energy generation unit. The estimated generating capacity of all net metering systems shall count for purposes of compliance with any applicable federal law. Any non-retail electric supplier who sells a qualified electric energy generation unit or who provides a net metering service to a customer-generator under the act shall be subject to certain requirements described in the act. Provisions of the act shall be enforced by the Attorney General under the Missouri Merchandising Practices Act as described in the act. The act is identical SB 467 (2025), SB 855 (2024), HB 1705 (2024), HB 1854 (2024), substantially similar to HB 370 (2025), HB 940 (2025), and similar to SB 642 (2023), HB 709 (2023) and HB 991 (2023). JULIA SHEVELEVA

Missouri · 2026 Regular Session · upper

Follow this bill’s action updates (Atom)

Subscribe in a feed reader. The feed covers recorded actions from the last 30 days; Bill Commons may record an action after it happened at the legislature.

Quick answers

Did MO SB 1208 pass?

No. MO SB 1208 died when the 2026 Regular Session adjourned without final action on it. Bills that die this way are sometimes reintroduced in a later session. Latest recorded action (2026-03-10): Hearing Conducted S Commerce, Consumer Protection, Energy & the Environment Committee

What is MO SB 1208 about?

MO SB 1208 is a bill in the 2026 Regular Session titled “SB 1208 - Under the act, a retail electric supplier shall offer net metering, as defined in the act, to customer-generators pursuant to a Public Service Commission approved tariff of an electrical corporation or contract approved by the governing body of other retail electric supplies under certain options described in the act. A customer-generator's facility shall be equipped with certain equipment including, but not limited to, necessary electric distribution system upgrades. If the electricity generated by the customer-generator exceeds the electricity supplied by the supplier during a billing cycle, the customer-generator shall demand charges for the billing cycle. Each qualified electric energy generation unit used by a customer-generator shall be installed, maintained, and repaired in accordance with all applicable industry standards described in current law. All qualified electric energy generation units utilizing battery backup shall be installed to operate completely isolated from the retail electric supplier's system including all neutral connections and grounding points during times of back up operation. Unless allowed under the provisions of the act, no retail electric supplier shall impose any fee or other requirement as described in current law, except that a retail electric supplier may require that a customer-generator's system contain adequate surge protection, or other accessible device that would allow emergency response personnel to disconnect from the electric distribution system. Applications by a customer-generator for interconnection of a qualified electric energy generation shall be accompanied by a plan for the customer-generator's electrical generating system and reviewed by a retail electric supplier, unless mutually agreed to. Prior to the interconnection of the qualified electric energy generation to the retail electric supplier's system, the customer-generator will furnish a retail electric supplier a certification from a professional electrician or an engineer deemed qualified by the retail electric supplier. If the professional electrician or engineer is not licensed, the retail electric supplier may require a bond or other form of financial security to ensure the safe installation and operation of the qualified electric energy generation unit. The estimated generating capacity of all net metering systems shall count for purposes of compliance with any applicable federal law. Any non-retail electric supplier who sells a qualified electric energy generation unit or who provides a net metering service to a customer-generator under the act shall be subject to certain requirements described in the act. Provisions of the act shall be enforced by the Attorney General under the Missouri Merchandising Practices Act as described in the act. The act is identical SB 467 (2025), SB 855 (2024), HB 1705 (2024), HB 1854 (2024), substantially similar to HB 370 (2025), HB 940 (2025), and similar to SB 642 (2023), HB 709 (2023) and HB 991 (2023). JULIA SHEVELEVA”.

Who sponsors MO SB 1208?

Gregory (21), Kurtis is the primary sponsor of MO SB 1208.

Description

SB 1208 - Under the act, a retail electric supplier shall offer net metering, as defined in the act, to customer-generators pursuant to a Public Service Commission approved tariff of an electrical corporation or contract approved by the governing body of other retail electric supplies under certain options described in the act. A customer-generator's facility shall be equipped with certain equipment including, but not limited to, necessary electric distribution system upgrades. If the electricity generated by the customer-generator exceeds the electricity supplied by the supplier during a billing cycle, the customer-generator shall demand charges for the billing cycle. Each qualified electric energy generation unit used by a customer-generator shall be installed, maintained, and repaired in accordance with all applicable industry standards described in current law. All qualified electric energy generation units utilizing battery backup shall be installed to operate completely isolated from the retail electric supplier's system including all neutral connections and grounding points during times of back up operation. Unless allowed under the provisions of the act, no retail electric supplier shall impose any fee or other requirement as described in current law, except that a retail electric supplier may require that a customer-generator's system contain adequate surge protection, or other accessible device that would allow emergency response personnel to disconnect from the electric distribution system. Applications by a customer-generator for interconnection of a qualified electric energy generation shall be accompanied by a plan for the customer-generator's electrical generating system and reviewed by a retail electric supplier, unless mutually agreed to. Prior to the interconnection of the qualified electric energy generation to the retail electric supplier's system, the customer-generator will furnish a retail electric supplier a certification from a professional electrician or an engineer deemed qualified by the retail electric supplier. If the professional electrician or engineer is not licensed, the retail electric supplier may require a bond or other form of financial security to ensure the safe installation and operation of the qualified electric energy generation unit. The estimated generating capacity of all net metering systems shall count for purposes of compliance with any applicable federal law. Any non-retail electric supplier who sells a qualified electric energy generation unit or who provides a net metering service to a customer-generator under the act shall be subject to certain requirements described in the act. Provisions of the act shall be enforced by the Attorney General under the Missouri Merchandising Practices Act as described in the act. The act is identical SB 467 (2025), SB 855 (2024), HB 1705 (2024), HB 1854 (2024), substantially similar to HB 370 (2025), HB 940 (2025), and similar to SB 642 (2023), HB 709 (2023) and HB 991 (2023). JULIA SHEVELEVA

Introduced
—
Latest action
2026-03-10 — Hearing Conducted S Commerce, Consumer Protection, Energy & the Environment Committee
Bill type
bill
Last updated
—

Sponsors

  • Gregory (21), Kurtisprimary

Committees

Not provided by source.

Action timeline

Newest first

  1. 2026-03-10

    Hearing Conducted S Commerce, Consumer Protection, Energy & the Environment Committee

  2. 2026-01-27

    Second Read and Referred S Commerce, Consumer Protection, Energy & the Environment Committee

    reading-2,referral-committee

  3. 2026-01-07

    S First Read

    reading-1

  4. 2025-12-01

    Prefiled

Versions

Documents

Votes

Not provided by source.

Related bills

No related bills recorded for this bill.

Official source

Attribution

Data from openstates_bulk_csv, retrieved 2026-07-24T05:25:15.077812Z

Inspect retained evidence for changes recorded after evidence tracking began:

Session-wide evidence can include changes to other bills:

Use this data

Every field on this page is available from the free public API — no key or licence required. Fetch this bill as JSON: GET /api/v1/bills?jurisdiction=MO&identifier=SB 1208. See the API docs or the MCP server for AI assistants.

Known limitations

  • Sponsor party and chamber affiliation are not yet captured by this API.
  • Committee referrals are not yet captured.

See the methodology page for data sources and limitations.