SS/SCS/SB 838 - The act creates and modifies certain provisions relating to electric utilities. UTILITY COLOCATION (Section 227.241) The State Highways and Transportation Commission and the Missouri Department of Transportation shall allow the installation, operation, and maintenance of electric transmission facilities within highway rights of way. The Commission and Department shall develop uniform criteria for colocation of transmission facilities within highway rights of ways. The duty of the Commission and Department shall include providing reasonable time lines and procedures for review and approval of colocation requests, ensuring safety of the public and infrastructure, avoiding duplication of corridors, and imposing reasonable conditions that shall not interfere with colocation. This provision is identical to SB 1711 (2026) and HB 3456 (2026). ENERGY PRODUCTION (Section 260.035) The act removes nuclear energy from the type of energy the State Environmental Improvement and Energy Resources Authority may not purchase. This provision is identical to a provision in HCS/HB 2807 (2026) and similar to a provision in HB 2657 (2026). RENEWABLE ENERGY STANDARD (Sections 393.1025 and 393.1030) The act provides each kilowatt-hour of renewable energy generated and stored using an eligible battery energy storage system, as defined in the act, located in the state that becomes operational after December 31, 2026, shall count as an additional 0.25 kilowatt-hours, for a total of 1.50 kilowatt-hours for purposes of compliance. The act repeals a provision relating to the renewable energy portfolio requirements applying to certain electric utilities. The act modifies the definition of an "accelerated renewable buyer". An electrical corporation shall not demand any charge for service based on the costs of construction work in progress for any nuclear power generating facility. SURCHARGES FOR NUCLEAR ENERGY (Section 393.1905) No nuclear energy related cost may be recovered through any surcharge or any rate making mechanism outside a general rate proceeding. ZERO EMISSION (Section 393.1910) The Public Service Commission may authorize an electric utility to offer or participate in a zero emission credit program or tariff. A zero emission credit may exist for up to three years from the date of its creation, may only be used once, and may not be used to satisfy any similar non-federal requirement if one exists. The Commission shall not increase the allowed return on equity for an electric utility solely because that utility is constructing a zero emission facility. JULIA SHEVELEVA

Missouri · 2026 Regular Session · upper

Follow this bill’s action updates (Atom)

Subscribe in a feed reader. The feed covers recorded actions from the last 30 days; Bill Commons may record an action after it happened at the legislature.

Quick answers

Did MO SB 838 pass?

No. MO SB 838 died when the 2026 Regular Session adjourned without final action on it. Bills that die this way are sometimes reintroduced in a later session. Latest recorded action (2026-05-15): Informal Calendar S Bills for Third Reading

What is MO SB 838 about?

MO SB 838 is a bill in the 2026 Regular Session titled “SS/SCS/SB 838 - The act creates and modifies certain provisions relating to electric utilities. UTILITY COLOCATION (Section 227.241) The State Highways and Transportation Commission and the Missouri Department of Transportation shall allow the installation, operation, and maintenance of electric transmission facilities within highway rights of way. The Commission and Department shall develop uniform criteria for colocation of transmission facilities within highway rights of ways. The duty of the Commission and Department shall include providing reasonable time lines and procedures for review and approval of colocation requests, ensuring safety of the public and infrastructure, avoiding duplication of corridors, and imposing reasonable conditions that shall not interfere with colocation. This provision is identical to SB 1711 (2026) and HB 3456 (2026). ENERGY PRODUCTION (Section 260.035) The act removes nuclear energy from the type of energy the State Environmental Improvement and Energy Resources Authority may not purchase. This provision is identical to a provision in HCS/HB 2807 (2026) and similar to a provision in HB 2657 (2026). RENEWABLE ENERGY STANDARD (Sections 393.1025 and 393.1030) The act provides each kilowatt-hour of renewable energy generated and stored using an eligible battery energy storage system, as defined in the act, located in the state that becomes operational after December 31, 2026, shall count as an additional 0.25 kilowatt-hours, for a total of 1.50 kilowatt-hours for purposes of compliance. The act repeals a provision relating to the renewable energy portfolio requirements applying to certain electric utilities. The act modifies the definition of an "accelerated renewable buyer". An electrical corporation shall not demand any charge for service based on the costs of construction work in progress for any nuclear power generating facility. SURCHARGES FOR NUCLEAR ENERGY (Section 393.1905) No nuclear energy related cost may be recovered through any surcharge or any rate making mechanism outside a general rate proceeding. ZERO EMISSION (Section 393.1910) The Public Service Commission may authorize an electric utility to offer or participate in a zero emission credit program or tariff. A zero emission credit may exist for up to three years from the date of its creation, may only be used once, and may not be used to satisfy any similar non-federal requirement if one exists. The Commission shall not increase the allowed return on equity for an electric utility solely because that utility is constructing a zero emission facility. JULIA SHEVELEVA”.

Who sponsors MO SB 838?

Cierpiot, Mike is the primary sponsor of MO SB 838.

Description

SS/SCS/SB 838 - The act creates and modifies certain provisions relating to electric utilities. UTILITY COLOCATION (Section 227.241) The State Highways and Transportation Commission and the Missouri Department of Transportation shall allow the installation, operation, and maintenance of electric transmission facilities within highway rights of way. The Commission and Department shall develop uniform criteria for colocation of transmission facilities within highway rights of ways. The duty of the Commission and Department shall include providing reasonable time lines and procedures for review and approval of colocation requests, ensuring safety of the public and infrastructure, avoiding duplication of corridors, and imposing reasonable conditions that shall not interfere with colocation. This provision is identical to SB 1711 (2026) and HB 3456 (2026). ENERGY PRODUCTION (Section 260.035) The act removes nuclear energy from the type of energy the State Environmental Improvement and Energy Resources Authority may not purchase. This provision is identical to a provision in HCS/HB 2807 (2026) and similar to a provision in HB 2657 (2026). RENEWABLE ENERGY STANDARD (Sections 393.1025 and 393.1030) The act provides each kilowatt-hour of renewable energy generated and stored using an eligible battery energy storage system, as defined in the act, located in the state that becomes operational after December 31, 2026, shall count as an additional 0.25 kilowatt-hours, for a total of 1.50 kilowatt-hours for purposes of compliance. The act repeals a provision relating to the renewable energy portfolio requirements applying to certain electric utilities. The act modifies the definition of an "accelerated renewable buyer". An electrical corporation shall not demand any charge for service based on the costs of construction work in progress for any nuclear power generating facility. SURCHARGES FOR NUCLEAR ENERGY (Section 393.1905) No nuclear energy related cost may be recovered through any surcharge or any rate making mechanism outside a general rate proceeding. ZERO EMISSION (Section 393.1910) The Public Service Commission may authorize an electric utility to offer or participate in a zero emission credit program or tariff. A zero emission credit may exist for up to three years from the date of its creation, may only be used once, and may not be used to satisfy any similar non-federal requirement if one exists. The Commission shall not increase the allowed return on equity for an electric utility solely because that utility is constructing a zero emission facility. JULIA SHEVELEVA

Introduced
—
Latest action
2026-05-15 — Informal Calendar S Bills for Third Reading
Bill type
bill
Last updated
—

Sponsors

  • Cierpiot, Mikeprimary

Committees

Not provided by source.

Action timeline

Newest first

  1. 2026-05-15

    Informal Calendar S Bills for Third Reading

    reading-3

  2. 2026-04-13

    Bill Placed on Informal Calendar

  3. 2026-04-08

    SS for SCS S offered (Cierpiot)--(4751S.05F)

  4. 2026-04-08

    SA 1 to SS for SCS S offered & adopted (McCreery)--(4751S05.02S)

  5. 2026-04-08

    SA 2 to SS for SCS S offered & adopted (McCreery)--(4751S05.03S)

  6. 2026-04-08

    SA 3 to SS for SCS S offered & adopted (Nicola)--(4751S05.01S)

  7. 2026-04-08

    SS for SCS, as amended, S adopted

    passage

  8. 2026-04-08

    Perfected

  9. 2026-04-08

    Reported Truly Perfected S Rules, Joint Rules, Resolutions and Ethics Committee

  10. 2026-03-02

    Bill Placed on Informal Calendar

  11. 2026-02-19

    Reported from S Commerce, Consumer Protection, Energy & the Environment Committee w/SCS

  12. 2026-02-10

    SCS Voted Do Pass S Commerce, Consumer Protection, Energy & the Environment Committee (4751S.03C)

    committee-passage

  13. 2026-01-28

    Hearing Conducted S Commerce, Consumer Protection, Energy & the Environment Committee

  14. 2026-01-08

    Second Read and Referred S Commerce, Consumer Protection, Energy & the Environment Committee

    reading-2,referral-committee

  15. 2026-01-07

    S First Read

    reading-1

  16. 2025-12-01

    Prefiled

Versions

  • 4/8/2026 - SA 3 to SS for SCS S offered & adopted (Nicola)--(4751S05.01S) 4/8/2026 - AdoptedCompare
  • 4/8/2026 - SA 2 to SS for SCS S offered & adopted (McCreery)--(4751S05.03S) 4/8/2026 - AdoptedCompare
  • 4/8/2026 - SA 1 to SS for SCS S offered & adopted (McCreery)--(4751S05.02S) 4/8/2026 - AdoptedCompare
  • 4/8/2026 - SS for SCS S offered (Cierpiot)--(4751S.05F) 4/8/2026 - Adopted, as amendedCompare
  • 4751S.01I - IntroducedCompare
  • 4751S.03C - Senate Committee SubstituteCompare
  • 4751S.05P - PerfectedCompare

Documents

Votes

Not provided by source.

Related bills

No related bills recorded for this bill.

Official source

Attribution

Data from openstates_bulk_csv, retrieved 2026-07-24T05:25:15.077812Z

Inspect retained evidence for changes recorded after evidence tracking began:

Session-wide evidence can include changes to other bills:

Use this data

Every field on this page is available from the free public API — no key or licence required. Fetch this bill as JSON: GET /api/v1/bills?jurisdiction=MO&identifier=SB 838. See the API docs or the MCP server for AI assistants.

Known limitations

  • Sponsor party and chamber affiliation are not yet captured by this API.
  • Committee referrals are not yet captured.

See the methodology page for data sources and limitations.