Compare versions
--- version:As Amended by the Senate+++ version:Introduced@@ -1,5 +1,4 @@-SB 439 - AS AMENDED BY THE SENATE-01/29/2026 0176s+SB 439 - AS INTRODUCED2026 SESSION26-223606/09@@ -14,8 +13,8 @@Explanation: Matter added to current law appears in bold italics.Matter removed from current law appears [in brackets and struckthrough.]Matter which is either (a) all new or (b) repealed and reenacted appears in regular type.-SB 439 - AS AMENDED BY THE SENATE-01/29/2026 0176s 26-2236+SB 439 - AS INTRODUCED+26-223606/09STATE OF NEW HAMPSHIREIn the Year of Our Lord Two Thousand Twenty-Six@@ -26,16 +25,32 @@Data Centers674:81 Definition. In this subdivision, “data center” means a facility used primarily for thestorage, processing, management, and transmission of digital data. “Data center” does not include a-facility that does not exceed 25 percent of the gross floor area of all on-site buildings, is used to serve+facility that does not exceed 10 percent of the gross floor area of all on-site buildings, is used to servethe enterprise functions of the on-site property owner, and is not used to lease data services to thirdparties.674:82 Zoning Authority to Permit Data Centers.-I. Data centers are allowed within zoning districts designated for commercial or industrial-use and subject to the provisions of local land use regulations.-674:83 Rulemaking.-The planning board, with the approval of the local legislative body, may adopt regulations as-necessary.-2 Effective Date. This act shall take effect 60 days after its passage.+I. A local legislative body may permit the establishment of data centers within zoning+districts designated for commercial or industrial use, subject to the provisions of this subdivision and+local land use regulations adopted pursuant to this title.+II. Data centers shall not be permitted within 2,640 feet of a passenger rail station or other+high-capacity transit facility approved by the municipality or the department of transportation.+III. No data center shall be approved until the applicant has provided written confirmation+from the serving electric utility that adequate electrical capacity shall be available to meet the+facility’s projected energy demand within 2 years of construction.+IV. Noise levels generated by a data center located within 300 feet of a residential district+shall not exceed the ambient noise level at the property line of the nearest residentially zoned parcel+by more than 5 percent. The applicant shall submit a noise study performed by a qualified+acoustical engineer to the planning board prior to site plan approval.+674:83 Design and Siting Standards.+I. All mechanical and electrical equipment, including but not limited to transformers and+generators, shall be set back a minimum of 150 feet from any public right-of-way or residentially+zoned property and shall be fully screened by an architecturally integrated structure or decorative+wall.+II. A minimum 30-foot-wide perimeter landscape buffer shall be provided, including at least+2 staggered rows of large canopy trees spaced 20 feet on center and sufficient underplanting to+achieve 75 percent live vegetative coverage.+III. Building facades exceeding 100 feet in length shall include architectural variations in+color, material, pattern, texture, height, or fenestration to avoid large, monolithic surfaces.123@@ -51,3 +66,41 @@131415+16+17+18+19+20+21+22+23+24+25+26+27+28+29+30+31+SB 439 - AS INTRODUCED+- Page 2 -+IV. All street frontages shall include a detached sidewalk at least 6 feet in width, separated+from the curb by a landscaped strip at least 8 feet in width planted with large canopy street trees at+20-foot spacing or equivalent groupings.+V. On-site pedestrian pathways shall be shaded by structures, plantings, or both to provide+a minimum of 75 percent shade coverage at maturity.+674:84 Rulemaking.+The planning board, with the approval of the local legislative body, may adopt regulations+necessary to implement this subdivision, including additional performance, screening, or design+standards, consistent with the purpose of this subdivision.+2 Effective Date. This act shall take effect 60 days after its passage.+1+2+3+4+5+6+7+8+9+10
Diffs are computed deterministically from extracted bill text and show additions, deletions, and section moves. Scanned-PDF text extracted via OCR is flagged where confidence is low; see methodology.